Storage Tank Management
Consultech Environmental has extensive experience in providing tank management plans, closure of USTs/ASTs by removal, site assessments and remediation of impacted sites, tank and fuel distribution systems installation. Additionally, Consultech also offers Non Destructive Testing (NDT) of ASTs and USTs. Utilizing some of the latest technologies available (i.e. robotics, ultrasonic thickness, vacuum), testing and inspections in accordance with American Petroleum Institute (API) and Steel Tank Institute (STI) protocols.
By utilizing our experienced personnel and specialty equipment, our customers can be assured their underground or above ground storage tank project is completed in full compliance with all local, state, and federal protocols.
Projects with which Consultech has been involved include the following elements:
- AST / UST Removal / Closure
- AST / UST Upgrades & Install
- O&W Separator Install & Service
- AST / UST Management/ Testing
- Non Destructive Tank Testing
- Ethanol Tank Conversion & Cleaning
- Geophysical Evaluations
- Compliance Review
- Comprehensive Site Assessment/Corrective Action Plans
- Spill Prevention Control and Countermeasures (SPCC) Plans
- Secondary Containment Installation
- Tank Emissions Testing
Representative Projects
South Carolina Department of Health & Environmental Control
Consultech has performed various environmental site assessments and remediation contracts (Tier II/Tier III) for the South Carolina DHEC since 1999. The scope of services for the site assessment (Tier II) has typically included:
- UST removal & soil excavation
- Site screening for plume delineation
- Monitoring well installation
- Sampling/analyses for VOCs/semi-VOCs & metals
- Receptor surveys
- Risk assessment, dissolved plume delineation, and comprehensive report preparation
Georgia Environmental Protection Department
During 2000-2007, Consultech performed environmental site investigations and remediation at various commercial and industrial facilities throughout Georgia. The scope of work consisted of:
- UST closure
- Site characterization
- Plume delineation
- Groundwater modeling
- Remedial designs
- Remedial system installations
- Quarterly/biannual monitoring
USACE, Savannah District
Removal of two 4,000 gallon active USTs, and two 4,000 gallon inactive USTs including removal of approximately 800 feet long product lines. Additional work include soil sampling/analyses and excavation of up to 100 tons of petroleum contaminated soils. A UST Closure report was submitted in accordance with the GAEPD requirements.
Goodyear Tire & Rubber Company, North Carolina
Contract was for the 10 year API-653 inspection of (1) 80,000 #6 Oil Tank that is 40 feet high and 59 feet in diameter. The inspection consisted of both an internal and external non-destructive testing (NDT) protocols inspection. The internal inspection was performed with a robotic in-tank sensor without the need for product removal, while external testing was performed by a combination of Ultrasonic Thickness (UT) meters and visual checks. Additionally, (5) horizontal aboveground storage tanks containing various heated oils were also testing using Steel Tank Institute (STI SP001) guidelines. The tanks ranged in size from 30,000 gallon down to 12,000 gallon in size. All of the tanks had an outer fiberglass insulation wrap that needed to be removed at certain areas for accessing the tank shell. The tanks wall thicknesses were tested with a (NDT) devise and all other mounts, saddles, nozzles, flanges, etc. had a visual inspection performed.